
Part No. 4801-5169 Rev 12-07 Rollup Curtain System Page 17
C- Channel
7. Rollup Drive – Single / Double Rack Mount
1. Center cabinet over framed opening directly against the C-channel. See Figure 8 Detail A.
2. Place the L-bracket on the C-channel and mount with Tek Screws.
3. Fasten the L-bracket to the cabinet with Tek screws. Place two L-brackets (typically) at the top and two at
the bottom of the cabinet.
4. Screw through the C-channel into the tubular members of the cabinet.
5. Verify that the Bottom of the curtain is two inches from the bottom of the cabinet. See Detail B.
Figure 8
L Bracket
Lower Cabinet
Upper Cabinet
C- Channel
Self Drilling
TEk Screws
L Bracket
Self Drilling
TEk Screws
1 "
(approx.)
Detail A
Detail B
Curtain
Bottom
Cabinet
Comentarios a estos manuales